PVBridge

Field notes

What the factories actually look like, written down.

No “top 10 suppliers” lists. Each note answers one question a buyer has already asked us, and says what we saw rather than what a brochure claims.

  • Verification 24 Nov 2026 9 min read

    How to verify a solar panel manufacturer before the deposit leaves your account

    Seven checks you can run yourself in a week, ranked by how often each one turns up something. Most of them cost nothing but an email and a company-registry lookup — and the two that matter most are the two buyers skip.

    Read the note
  • Compliance In progress

    What has to be inside a CBAM carbon file for a PV module

    Where the emissions boundary actually falls, why a cell-level figure is not a module-level figure, and which default values will get a declaration rejected.

  • Verification In progress

    Reading an EL image: what a dark cell does and does not tell you

    Micro-cracks, inactive cells and grid-line breaks look similar in a thumbnail and mean very different things at claim time.

  • Storage In progress

    Shipping a BESS container: the documents that stop the booking

    UN 38.3, the state-of-charge declaration, and why the dangerous-goods paperwork is usually wrong on the first submission.